BIM & Clash Coordination (LOD 400)
Developing fully coordinated 3D Building Information Models (BIM) to run automated clash detection, ensuring MEP routing fits structural dimensions with zero physical interface issues.
Service Capabilities
Design Integration
GoTech’s design coordination division acts as the critical bridge between architectural intent and actual site execution. We coordinate closely with lead consultants, client representatives, and trade specialists to ensure all structural concrete, architectural envelopes, and complex MEP networks are fully integrated, clash-free, and buildable.
By resolving design discrepancies, conducting comprehensive constructability reviews, and preparing highly detailed shop drawings beforehand, we prevent costly site alterations, material waste, and scheduling delays. This upfront engineering precision guarantees execution velocity once site works commence.
Core Specialisms
Developing fully coordinated 3D Building Information Models (BIM) to run automated clash detection, ensuring MEP routing fits structural dimensions with zero physical interface issues.
Navigating municipal approvals, coordinating building permits, and securing clearances from Dubai Municipality, DEWA, Civil Defence, and developer bodies (Nakheel, Emaar).
Analyzing design details to evaluate structural feasibility, material compatibility, trade sequencing, and proposing efficient value-engineering solutions to optimize project budgets.
Producing detailed fabrication drawings, reinforcement concrete (RC) details, wall elevations, and builder's work openings to direct site installation crews accurately.
Service Engagement
We offer flexible execution models to match your project's commercial structure and technical complexity.
Full technical coordination and authority permitting packaged directly under our main contractor scope, minimizing interface risks between design and site trades.
Constructability audits, BIM clash sweeps, and authority permitting liaison performed on a fee-for-service basis before final main contract awards.
Acting as the central BIM manager for all subcontractors, running clash detection, and maintaining the LOD 400 federated model on behalf of the client.